What severity or range/size of a crack determines that the section of curb or sidewalk is to be replaced?

Sidewalk Cracking Defects and Deficiencies
100% found this useful

Can the CA use 200% of the value of defects and deficiencies to prevent Substantial Performance from being achieved?

Refer to GC 1.67.1 and GC 18.4.3

Substantial Performance Holdbacks GC 1.67.1 GC 18.4.3 Defects and Deficiencies
Not yet rated

There has been a preliminary deficiency holdback list with values sent out and it exceeds the final progress payment. What can a Contractor do?

Refer to General Conditions: GC 18.6, and GC 18.4.2. If there is a dispute about the established values, refer to GC 17.0.

Substantial Performance Holdbacks GC 18.6 GC 18.4.2 GC 17 Defects and Deficiencies
Not yet rated